Client: MODON

 

 

 

  • Contractual Duration: 18 months
  • Actual Completion Time: 10 months from the date of site handover

 

The project encompasses the construction of a Civil Defense and Fire Station in accordance with the approved drawings and specifications, and aligned with the highest quality and safety standards.

 

  • Site Preparation Works:
    Included excavation, backfilling, construction of concrete foundations, and all infrastructure works such as sewage, water supply, and electrical installations.
  • Structural and Architectural Works:
    Included the design, supply, and installation of the steel structure for the truck warehouse, in addition to general construction works according to the approved specifications and safety standards.
  • MEP and Safety Systems:
    Covered all mechanical works, firefighting systems, electrical systems, and safety features, along with complete finishing works.
  • Architectural and Technical Finishes:
    Included doors, glass facades, fire alarm systems, data and telephone installations across all sections, and a variety of fixtures and fittings.
  • Lighting and Storage Facilities:
    Included installation of lighting elements, street lighting poles, and GRP water tanks with all associated accessories.