Client: Saudi Ceramics Company
Contract Duration: 3/03/2014 To 3/05/2015
The Project is Located in the Industrial Area, Durma’a, the Owing Entity is (Saudi Ceramics Co.) on the total Area of 125,000 M⊃2;, and it was Executed according to the Specifications & Drawings. The detailed illustration (Saudi Ceramics Project) Works, Etraction of Steel Structural, Construction of underground water tank, installation of the production infrastructural & production facilities, construction of the “main dryer Building “and the installation the Excavator Cart Rail way.