Client: Alwatania For Industries
Contract Duration: 24/04/2013 To 20/02/2015
The Project is Located in the Industrial Area, Durma’a, the Owing Entity is (Al Watania for Industrial Co.) on the total Area of 125,000 M⊃2;, and it was Executed according to the Specifications & Drawings. The detailed illustration (Al Watania for Industrial Project) Works, Etraction of Steel Structural, Construction of underground water tank, installation of the production infrastructural & production facilities, construction of the “main dryer Building “