Client: MODON
Contract Duration: 20/05/2015 To 21/02/2016
The Project is Located in the third Industrial Area in Riyadh, the Owing Entity is (Saudi industrial property authority “MODON”) on the total Area of 18,000 M⊃2;, and it was Executed according to the Specifications & Drawings. The detailed illustration this Project Works, Extraction of Steel Structural, Construction of underground water tank, installation of the production infrastructural & production facilities