Client: MODON
Contract Duration: 21/05/2015 To 20/02/2016
The Project is Located in the second Industrial Area in Riyadh, the Owing Entity is (Saudi industrial property authority “MODON”) on the total Area of 7,200 M⊃2;, and it was Executed according to the Specifications &Drawings. The detailed illustration this Project Works, Extraction of Steel Structural, Construction of underground water tank, installation of the production infrastructural & production facilities.