Client: National Water Company
Contract Duration: 01/12/2016 To 31/05/2018
Execution of underground water networks with 100 mm and 150 mm of ductile iron material pipes, the nominal pressure of the water networks (16 Bar) , including excavation and backfilling , and all the connection accessories and fittings and the supply and installation of the network gate valves diameter 100 & 200 mm ,, And the asphalt work and all road recovery works and all what is needed to finish the works in the ideal manner.